Friday 16 November 2012

Brent Greens oppose Harlesden incinerator plans

The site
Brent Green Party has joined opponents of the Energy Recovery Plant (locally known more directly as the Harlesden incinerator)  proposed for the Willesden Junction site on the borders of Brent.  They have sent the following objection to Ealing Council Planning Committee  LINK

CONTEXT
Brent Green Party is concerned about the negative environmental impact of the major part of the planning application, relating to the pyrolysis plant. We do not have equal objection to the anaerobic digestion part of the plant, since we recognise the potential benefit of utilizing CH4 released by biomass for energy rather than putting it in landfill, where it would be released anyway, contributing to climate change.

However, we cannot support the application taken as a whole and state our OBJECTIONS here:

AIR QUALITY
-         Insufficient modelling of potential air quality impacts and their assessment and foreclosure of the need for additional health impact assessments in line with Environmental Agency stipulations.

-         Insufficient assessment of the need for appropriate mitigation measures in light of potential air quality impacts at the planning application stage in line with EA stipulations.

CO2
-         Pyrolysis produces bio-oil and syngas which when combusted for energy, produce vast amounts of CO2, wholly inconsistent with the achievement of EU emission targets.

WATER COURSES
-         Contamination of London canals from run off pollutants during construction, not sufficiently mitigated by drainage measures.

-         Region is water stressed in terms of supply of mains water and site water demand will exacerbate this, in excess to the rainwater-harvesting techniques designed to reduce onsite mains water demand.

PEDESTRIANS
-         During construction, adverse effects on users of playground in Harley road, residential properties and pedestrians in Old Oak Lane Conservation Area, users of the Grand Union Canal and pedestrians walking through Metro Multi Trading Estate.

CONSTRUCTION
-         Adverse noise pollution during construction.

-         Medium to low risk impact of dust generated during construction.

-         Potential for ground contamination during construction period.

-         Potential for ground contamination from storage/handling of oils, chemicals & waste materials from the new plant, not met by proposal to place in storage facilities.

For these reasons we strongly object to the proposal in its current form.

Yours sincerely,

Dr Shahrar Ali, Spokesperson for Planning and Environment
Brent Green Party, PO Box 54786, London NW9 1FL